News · Practical guide

Energy efficiency: define a baseline before counting savings

A measurement worksheet distinguishes energy intensity, total use and the cost of a proposed improvement.

What would have happened without the change?

IEA’s report discusses energy efficiency at a broad scale. A site project needs its own baseline: the service delivered, energy used, period and relevant conditions. Lower energy intensity and lower total consumption are different results. A factory can use less energy per unit while using more overall because it produces more.

A baseline record

FieldRecord
ServiceProduct quantity, floor area, occupancy or another relevant activity
EnergyMeter, fuel, units and period
ConditionsWeather, hours, output mix and equipment state
ChangeInstallation date, operating settings and maintenance
CostEquipment, installation, disruption, service and replacement
EvidenceReadings, adjustment method and unresolved effects

A fictional constant-activity comparison

At the same stated activity, fictional energy use falls from 100 to 90 units. The simple reduction is (100 − 90) ÷ 100 = 10%. If output rises from 100 to 120 product units while energy rises to 108, total energy increases 8%, although intensity falls from 1 to 0.9 energy units per product. These are different statements. Weather or operating changes would need further adjustment before attributing the whole effect to a project.

Do not buy a percentage without its boundary

Request the assumptions behind a saving estimate and compare them with the site’s actual operation. Track both energy and delivered service after installation. A simple payback omits financing, changing rates and performance uncertainty unless explicitly included. The worksheet supports a scoped comparison; it does not establish that an unmeasured improvement is always the cheapest option.

Sources and scope

Sources checked October 10, 2026. AI-assisted research and drafting. The examples, calculations and worksheets are Luminesca editorial work; they are not measured trials, first-hand reporting or an independent certification. Removed the claim that every efficiency project is cheaper than new generation. Report a specific correction with its source.