News · Practical guide

Enhanced geothermal: distinguish a reservoir trial from a power plant

A project-stage worksheet for reading flow, temperature, output and commercial milestones.

The reservoir and the plant need separate evidence

DOE explains enhanced geothermal systems as an approach to accessing geothermal energy where a naturally productive system is insufficient. A drilling result, circulation test and commercial generation milestone are different evidence stages. A reported subsurface temperature does not by itself establish sustained electricity output or a delivered price.

Read the stage before the capacity

StageEvidence question
ResourceLocation, temperature method and uncertainty
Well and circulationTest duration, flow, pressure and relevant monitoring
PlantGross and net generation boundary; operating period
ConnectionGrid access and any delivery constraint
CommercialStart date, contractual scope and remaining conditions
EnvironmentApplicable permits, monitoring and site-specific findings

Keep proposed megawatts distinct from measured net generation. Record which costs are disclosed and whether drilling, replacement wells, connection and financing are included. We do not infer a site’s environmental acceptability from the technology label.

A fictional annual-energy assumption

If a hypothetical 10 MW net plant operated at an assumed 90% annual capacity factor, 10 × 8,760 × 0.90 = 78,840 MWh, or 78.84 GWh. This is a non-leap-year arithmetic scenario, not observed performance. Actual operating hours, outages and net output require evidence. A capacity-factor assumption is not a warranty.

A milestone that answers the question

For a procurement question, ask when the plant can deliver the contracted service and which milestones remain conditional. For a technology trial, ask what the test demonstrates and what it leaves untested. The useful next step is a specific missing record, rather than treating every successful well as a completed commercial project.

Sources and scope

Sources checked October 10, 2026. AI-assisted research and drafting. The examples, calculations and worksheets are Luminesca editorial work; they are not measured trials, first-hand reporting or an independent certification. Removed announcements presented as operating capacity and universal cost forecasts. Report a specific correction with its source.